Tuesday, February 28, 2012

Driveway

We brought the electrical line up the center of the driveway, which required a 4' trench down the middle of the previously graded drive. After the electrical lines were in and live, the trench was filled back in and the driveway was regraded. I love the curve that we designed into the driveway so it doesn't look like a straight shot up from Castle Valley Drive. Some day we will have to add gravel to the drive to keep the weeds out, but it looks great right now with that bright red dirt!