Tuesday, January 17, 2012

Trenches

In order to get the water from the well site to the cabin, we had to dig some pretty deep and long trenches.  I think it was about 300 feet of trenching from the well to the cabin for the water lines.  Electrical lines were run from the cabin back to the well in the same trench to power the well pump.  We also had them drop the phone and internet lines into this trench, which will eventually go out to the northeast corner of the lot and tie into the phone company facilities along Castle Valley Drive. I like this photo which really adds perspective to the significant trenching that had to be done.

No comments:

Post a Comment