Monday, March 12, 2012

Grading for Cabin Site

Since we are building slab on grade, the cabin site had to built up a bit to create a flat building site. A few loads of clean red dirt fill were brought in and graded and compacted to perfection. Since the winter was so mild this year, we were able to get the building site ready for construction a lot sooner than we thought. We now have all the infrastructure in and building site ready for the foundation.

No comments:

Post a Comment